澳门·威尼斯人(中国)官方网站

澳门·威尼斯人(中国)官方网站

| 举报 切换到宽版

澳门·威尼斯人(中国)官方网站

 找回密码
 注册

只需一步,快速开始

短信验证,便捷登录

搜索
查看: 882|回复: 1
打印

civil works tips [复制链接]

军衔等级:

  新兵

注册:2022-1-25
跳转到指定楼层
1#
发表于 2022-8-12 05:07:19 |只看该作者 |倒序浏览
1 SITE CIVIL WORK
1.1 Crushed stone material supplied is qualified.
1.2 Site backfilled with plain cement, crushed stone.
1.3 The retaining wall is straight, level and vertical.
1.4 The drainage pipes are properly installed.
1.5 Fence properly installed and razor wire coiled.
1.6 Razor wire is correctly coiled, steel wire is correctly installed.
1.7 Fence gate is correctly installed and operational.
1.8 Fence gate lock is operational.
1.9 Length of the site in _______meters.
1.10 Security house wall vertical and surface is smooth.
1.11 Security house roof/wall properly installed.
1.12 Quantity of generator slabs: __________
1.13 Quantity of solar panel slabs: __________
1.14 Quantity of ACDB/Meter box slabs: __________
1.15 Quantity of AVR slabs: __________
1.16 Manhole and its cover is qualified.

2 TOWER CIVIL WORK
2.1 Tower painting is properly conducted.
2.2 Tower washers, bolts and nuts are properly installed.
2.3 Tower members are straight.
2.4 Aviation light is properly installed, grounded and operational.
2.5 RF antenna poles and brackets are properly installed and mounted on tower.
2.6 Security light is properly installed and operational (Applicable inside the metro site ONLY).
2.7 Cable tray is properly installed on the ground. (Applicable inside the metro site ONLY).

3 EARTHING INSTALLATIONS
3.1 Earthing test result reading must be <10Ω. (Engineer must confirm this reading with Earth Tester; Actual reading __________)
3.2 Earthing materials are correctly installed and connected to the site.

举报本楼

军衔等级:

  上将

注册:2013-2-221350
2#
发表于 2022-8-12 10:11:41 |只看该作者

举报本楼

您需要登录后才可以回帖 登录 | 注册 |

( )|联系我们 |网站地图  

GMT+8, 2024-4-26 01:04 , Processed in 0.083024 second(s), 15 queries , Gzip On.

Copyright © 1999-2023 All Rights Reserved

回顶部